A Methods and Measurements Analyst for Timepiece, Inc What Is the Standard Time for This Task If the Develop
A methods and measurements analyst for Timepiece, Inc., needs to develop a time standard for the task of attaching a watch to a wristband. In a preliminary study, he observed one of his workers perform this task five times, with the following results: What is the standard time for this task if the employee worked at a 20 percent faster pace than average, and an allowance of 20 percent of job time is used?
A) 4.5 seconds
B) 5 seconds
C) 20 seconds
D) 28.8 seconds
E) 100 seconds
Correct Answer:
Verified
Q104: A methods and measurements analyst for
Q105: The owner of Kat Motel wants
Q106: The owner of Kat Motel wants
Q107: The owner of Touchdown Sports Bar wants
Q108: A methods and measurement analyst wants to
Q110: A methods and measurements analyst needs
Q111: The owner of Touchdown Sports Bar wants
Q112: A methods and measurement analyst wants to
Q113: A methods and measurements analyst for
Q114: A methods and measurements analyst for
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents