A methods and measurements analyst for Digital Devices needs to develop a time standard for the task of assembling a computer mouse. In a preliminary study, she observed one of her workers perform this task six times with the following results: What is the observed time for this task?
A) 34 seconds
B) 40 seconds
C) 46 seconds
D) 48 seconds
E) 240 seconds
Correct Answer:
Verified
Q100: In a stopwatch time study, adjusting the
Q101: The owner of Kat Motel wants
Q102: The owner of Touchdown Sports Bar wants
Q103: A methods and measurement analyst wants to
Q105: The owner of Kat Motel wants
Q106: The owner of Kat Motel wants
Q107: The owner of Touchdown Sports Bar wants
Q108: A methods and measurement analyst wants to
Q109: A methods and measurements analyst for
Q168: Methods analysis and motion study techniques develop
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents