In the probabilistic approach to project network analysis, the time estimate annotated tm for any activity is the:
A) mean time.
B) median time.
C) most likely timE.
D) mode time.
E) marginal time.
Correct Answer:
Verified
Q61: Which of the following is not a
Q67: A PERT/CPM activity has an optimistic time
Q74: Which of the following are advantages of
Q77: Consider the portion of a project depicted
Q78: The basis for use of the beta
Q81: Consider the following work breakdown structure:
Q82: A project is represented by the following
Q83: Consider the following work breakdown structure:
Q84: Consider the following work breakdown structure:
Q85: Consider the following work breakdown structure: