To reduce the wastefulness of jobs waiting in queues,the _____ system recommends feeding the bottleneck.
A) theory of constraints (TOC)
B) synchronized orchestral
C) optimum production technique (OPT)
D) Taguchi finite scheduling
E) a and c are equivalent
Correct Answer:
Verified
Q59: Shop floor control is part of
A)loading.
B)loading and
Q60: S.M.Johnson's algorithm derives the minimum completion times
Q61: Gantt load charts show what kind of
Q62: The bottleneck's processing rate is called _
Q63: For synchronized manufacturing,complex flow patterns are analyzed
Q65: For the transportation model in Section 16-5
Q66: _ decisions must often be made with
Q67: Too much job waiting is called _.
A)underloading
B)overloading
C)idle
Q68: _ and _ are done over and
Q69: For the transportation model in the text,which
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents