The bottleneck's processing rate is called _____ because _____.
A) the drum;it sets the production rate for all activities from upstream to downstream
B) the drum;it synchronizes only bottleneck activities
C) the buffer;the bottleneck queue sets the waiting time at that point
D) none of the above
Correct Answer:
Verified
Q57: _ is (are) designed to eliminate all
Q58: Sequencing jobs according to their shortest processing
Q59: Shop floor control is part of
A)loading.
B)loading and
Q60: S.M.Johnson's algorithm derives the minimum completion times
Q61: Gantt load charts show what kind of
Q63: For synchronized manufacturing,complex flow patterns are analyzed
Q64: To reduce the wastefulness of jobs waiting
Q65: For the transportation model in Section 16-5
Q66: _ decisions must often be made with
Q67: Too much job waiting is called _.
A)underloading
B)overloading
C)idle
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents