Which of the following is NOT a factor in determining the total cost of materials handling in manufacturing process layouts?
A) the cost of moving a load between departments
B) the number of loads to be moved between departments
C) the distance between departments
D) the number of employees in each department
Correct Answer:
Verified
Q23: The _ is a technique developed by
Q24: Which of the following characteristics of a
Q25: Which of the following methods is used
Q26: The letter X on the Muther's grid
Q27: A _ is a tool for analyzing
Q29: A line is said to be unbalanced
Q30: _ is the difference between the total
Q31: In line balancing,the desired cycle time (C)is
Q32: Which of the following methods is used
Q33: The letters on the Muther's grid indicate
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents