Question 61
Multiple Choice
If the firm is using lot size for a fixed period of two,what is the order size for the first order?
Question 62
Multiple Choice
What is the economic part-period (EPP) for ordering this item?
Question 63
Multiple Choice
What is the lot size for the second order using the part-period method?
Question 64
Multiple Choice
Which of the following are accurate statements concerning MPS,MRP and capacity requirements planning (CRP) ? I.CRP is equivalent to a master production schedule (MPS) . II.CRP is needed to determine if an MPS is feasible. III.CRP is an input to MRP. IV.Planned-order releases from MRP are the inputs for CRP.
Question 65
Multiple Choice
What is the net requirement for Whatzats to fill this order?
Question 66
Multiple Choice
If 40 Ps are needed,and on-hand inventory consists of 15 Ps and 10 each of all other components and subassemblies,how many Cs are needed?
Question 67
Multiple Choice
When should an order for Wherezats be released?
Question 68
Multiple Choice
A report that compares known and expected future capacity requirements with projected available capacity is a:
Question 69
Multiple Choice
If 17 Ps are needed,and no on-hand inventory exists,how many Cs will be needed?
Question 70
Multiple Choice
How many Wherezats should be ordered?
Question 71
Multiple Choice
Under fixed-interval lot sizing,order sizes for component parts are determined based on which one of the following?
Question 72
Essay
Using the product-tree shown,determine the following: (i)the quantity of component K that will be needed to assemble 80 units of P,assuming no on-hand inventory exists. (ii)the quantity of component K needed to assemble 80 units of P,given on-hand inventory of 30 A's,50 B's and 20 C's.
Question 73
Multiple Choice
If 17 Ps are needed,and on-hand inventory consists of 10 As,15 Bs,20 Cs,12 Ms and 5 Ns,how many Cs are needed?
Question 74
Multiple Choice
What is the correct sequence to go from the broadest to the most detailed form of operations planning?
Question 75
Multiple Choice
Budget overruns when implementing ERP systems are typically caused by: I.high equipment costs. II.high training costs. III.high capital interest charges. IV.costs of integrating and testing