In setting up a kanban control system, you need to determine the number of kanban card sets needed.If the expected demand during lead time is 50 per hour, the safety stock is 20 percent of the demand during lead time, the container size is 4, and the lead time to replenish an order is 2 hours, what number of kanban card sets is needed? ___________________
Correct Answer:
Verified
Q63: Explain why lean manufacturing requires a stable
Q64: Imagine comparing a manufacturing operation using regular
Q65: To develop a lean manufacturing system a
Q66: To implement a flow process in developing
Q71: In a lean production system, we expect
Q71: In setting up a kanban control system,
Q73: As lean production methods reduce changeover and
Q74: An activity where the parts that go
Q83: Which of the following is not listed
Q85: Which of the following is a lean
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents