The chart used to focus on busy and idle portions of a work cycle is a:
A) Worker-machine chart
B) Gantt chart
C) SIMO-chart
D) Idle chart
E) Flow process chart
Correct Answer:
Verified
Q61: In a stopwatch time study, the average
Q70: When performing a time study, the analyst
Q74: Which is not a requirement for an
Q75: A SIMO chart includes:
A)Delay
B)Storage
C)Transportation
D)Left/Right hand movements
E)Inspection
Q77: A behavioral approach to job design which
Q80: The methods analysis chart which describes the
Q91: A job has a normal time of
Q125: Which of the following is not a
Q151: Which of the following is not characteristic