Which of the following is NOT an element of lean?
A) Small lot sizes
B) Modularized master schedule
C) Multifunction workers
D) Kanban pull system
E) Perfect or nearly perfect quality
Correct Answer:
Verified
Q7: Supplier management in a lean system
A) may
Q8: With regards to suppliers,lean systems typically require
A)
Q9: Managing quality in a lean system
A) is
Q10: The time it takes a container to
Q11: Why is a uniform load desirable in
Q13: A kanban card is used to signal
Q14: One of the main objectives of a
Q15: The ideal lot size for a lean
Q16: For production control,lean pull systems are best
Q17: If it takes 100 minutes to complete