A kanban card is used to signal that
A) the next work center is stopped.
B) a materials handler has run out of parts.
C) a machine has broken down.
D) parts are needed by the subsequent work center.
E) a machine is ready for preventive maintenance.
Correct Answer:
Verified
Q8: With regards to suppliers,lean systems typically require
A)
Q9: Managing quality in a lean system
A) is
Q10: The time it takes a container to
Q11: Why is a uniform load desirable in
Q12: Which of the following is NOT an
Q14: One of the main objectives of a
Q15: The ideal lot size for a lean
Q16: For production control,lean pull systems are best
Q17: If it takes 100 minutes to complete
Q18: Given the following information pertaining to item