Quality control charts usually have a central line and upper and lower control limit lines.Which of the following is not a reason that the process being monitored with the chart should be investigated?
A) A large number of plots are close to the upper or lower control lines.
B) The behaviorbehaviour of the plots is erratic.
C) A single plot falls above or below the control limits.
D) TheeThere is a change in raw materials or operators.
E) There is a run of five above the central line.
Correct Answer:
Verified
Q7: Statistical process control involves testing random samples
Q12: In acceptance sampling, the value for the
Q21: LTPD in acceptance sampling stands for lot
Q23: The probability associated with rejecting a high-quality
Q24: In monitoring process quality, we might use
Q28: Quality control charts usually have a central
Q32: Sampling plans are generally displayed graphically through
Q33: Total, 100 percent inspection can never be
Q37: Standard practice in statistical process control for
Q38: AQL stands for accepting questionable lots in
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents