Quality control charts usually have a central line and upper and lower control limit lines.Which of the following is a reason that the process being monitored with the chart should be investigated?
A) A single plot falls above or below the control limits.
B) Behavior is normal.
C) A large number of plots are on or near the central line.
D) There is no real trend in any direction.
E) There is a change in raw materials or operators.
Correct Answer:
Verified
Q21: LTPD in acceptance sampling stands for lot
Q24: In monitoring process quality, we might use
Q25: Quality control charts usually have a central
Q25: The capability index (Cpk) calculates the percentage
Q29: You have just used the capability index
Q32: Sampling plans are generally displayed graphically through
Q33: Total, 100 percent inspection can never be
Q37: Standard practice in statistical process control for
Q38: AQL stands for accepting questionable lots in
Q39: The probability associated with accepting a low-quality
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents