You have just determined the actual number of workstations that will be used on an assembly line to be 6 using the assembly-line balancing procedure.The cycle time of the line is 5 minutes, and the sum of all that tasks required on the line is 25 minutes.Which of the following is the correct value for the resulting line's efficiency?
A) 0.500
B) 0.833
C) 0.973
D) 0.990
E) None of these
Correct Answer:
Verified
Q22: A project layout is characterized by a
Q28: Assembly-line balancing means assigning all necessary tasks
Q29: The objective of a retail service layout
Q30: Which of the following is not a
Q30: Using the assembly-line balancing procedure, which of
Q32: A project layout is characterized by a
Q33: In a good layout design for a
Q35: Which of the following is a basic
Q38: Using the assembly-line balancing procedure, which of
Q43: Using the assembly-line balancing procedure, which of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents