Question 21
True/False
A BOM file is often called a product structure file or product tree because it enumerates all of the component parts of the end item product.
Question 22
True/False
One of the biggest complaints by users of MRP systems is that MRP is too flexible in making changes in schedules when the need arises.
Question 23
True/False
In today's modern world of rapid computing and just-in-time replenishment of supplies,freezing the master production schedule is unnecessary.
Question 24
True/False
A modular bill of materials includes items with fractional options.
Question 25
True/False
To implement a MRP system successfully,a high degree of inventory and bill-of-material accuracy is required.This may involve significant change in how a firm operates.
Question 26
True/False
Computing the quantity of each component that goes into a finished product requires expanding (or exploding)each item in a product structure file and summing at all Levels.
Question 27
True/False
In a net change MRP system requirements and schedules are considered rigid and never updated.
Question 28
True/False
In a net change MRP system requirements and schedules are updated whenever a transaction is processed that has an impact on the item.
Question 29
True/False
Low Level coding in MRP indicates the exact status of each item managed by the system in "real time".
Question 30
True/False
Net change MRP systems are "activity" driven.
Question 31
True/False
An MRP program with a capacity requirements planning module allows rescheduling to try to Level capacity.
Question 32
True/False
One of the outputs of an MRP system is a bill of materials (BOM)file.
Question 33
True/False
A modular bill of materials is the term for an item that can be produced and stocked as a subassembly.
Question 34
True/False
The MRP program performs its analysis from the bottom of the product structure trees up,imploding requirements Level by Level.
Question 35
True/False
Computing the quantities of each component that goes into a finished product requires expanding (or exploding)each item in a product structure file and summing at all Levels.
Question 36
True/False
If you cannot provide a master production schedule (MPS)as an input file,you cannot run a material requirements planning (MRP)system.
Question 37
True/False
The philosophy of material requirements planning is that materials should be expedited when their lack would delay the overall production schedule and de-expedited when the schedule falls behind and postpones their need.