You have been called in as a consultant to set up a Kanban control system.The first thing to do is to determine the number of Kanban card sets needed.Your research shows that the expected demand during lead time for a particular component is 1,200 per hour.You estimate the safety stock should be set at 5% of the demand during lead time.The tote trays used as containers can hold 2 units of stock and the lead time to replenish an order is 10 hours.Which of the following is the number of Kanban card sets necessary to support this situation?
A) 5,000
B) 5,500
C) 6,300
D) 6,500
E) 7,000
Correct Answer:
Verified
Q43: In the textbook, Toyota's Fujio Cho identified
Q46: Which one of the following concepts is
Q50: In the textbook Toyota's Fujio Cho identified
Q53: To implement a flow process in developing
Q55: Which of the following statements holds true
Q56: In setting up a Kanban control system
Q56: Which of the following are elements that
Q59: You have been called in as a
Q73: In designing a lean production facility layout,
Q75: Group technology (GT) is credited with which
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents