The function of Capacity Requirements Planning (CRP) is to
A) Insure accurate inventory counts
B) Convert shop orders into scheduled work loads for factory work centers
C) Verify that the bill of material is accurate
D) Calculate "encumbered" inventory
E) Confirm that the MPS is accurate
Correct Answer:
Verified
Q39: Fixed order interval inventory control systems require
Q40: EOQ gives the delivery quantity when the
Q41: The two costs associated with inventories are:
A)
Q42: The relationship between the aggregate plan and
Q43: EOQ analysis seeks to reveal:
A) The lowest
Q45: The difference between MRP and MRP II
Q46: Just-In-Time (JIT)production planning relies on:
A) Close to
Q47: The inventory catalog is a useful tool
Q48: The inventory/open order netting concept is used
Q49: A major impact of JIT on purchasing
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents