The time it takes a container to complete an entire circuit consists of:
A) Move time,time used,and wait time
B) Wait time,run time,setup time,and idle time
C) Fill time,wait time,move time,time used,and time to be returned to be filled again
D) None of the above
Correct Answer:
Verified
Q2: External setup time refers to:
A)The time it
Q3: The ideal setup time for a lean
Q4: Reducing setup time is important because it:
A)Increases
Q5: With regards to suppliers,lean systems typically require:
A)Delivery
Q6: One of the main objectives of a
Q8: If a work center has no empty
Q10: A kanban card is used to signal
Q11: Why is a uniform load desirable in
Q12: Lean thinking can be applied to:
A)Manufacturing
B)Services
C)Functions other
Q17: If it takes 100 minutes to complete
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents