A kanban card is used to signal that:
A) The next work center is stopped
B) A materials handler has run out of parts
C) A machine has broken down
D) Parts are needed by the subsequent work center
E) A machine is ready for preventive maintenance
Correct Answer:
Verified
Q5: With regards to suppliers,lean systems typically require:
A)Delivery
Q6: One of the main objectives of a
Q7: The time it takes a container to
Q8: If a work center has no empty
Q11: Why is a uniform load desirable in
Q12: Lean thinking can be applied to:
A)Manufacturing
B)Services
C)Functions other
Q13: Reduction of setup time is accomplished by
Q14: Managing quality in a lean system:
A)Is easy
B)Means
Q15: Supplier management in a lean system:
A)May require
Q17: If it takes 100 minutes to complete
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents