You have just determined the actual number of workstations that will be used on an assembly line to be 6 using the assembly-line balancing procedure.The cycle time of the line is 5 minutes and the sum of all that tasks required on the line is 25 minutes.Which of the following is the correct value for the resulting line's efficiency?
A) 0.500
B) 0.833
C) 0.973
D) 0.990
E) None of the above
Correct Answer:
Verified
Q28: Which of the following is a basic
Q33: Which of the following is not a
Q34: Assume a fixed cost for a process
Q36: In a workcenter, machine A has a
Q47: You are hired as a consultant to
Q51: You have just determined the actual number
Q52: Which of the following is not considered
Q53: When balancing an assembly line, which of
Q53: Using the assembly-line balancing procedure,which of the
Q55: The objective of mixed-model line balancing is
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents