In PERT,the activity duration time is equal to:
A) pessimistic time
B) optimistic time
C) most likely time
D) mean duration
Correct Answer:
Verified
Q2: Slack equals
A)LF - EF.
B)EF - LF.
C)EF -
Q23: Activities following a node
A) can begin as
Q31: When activity times are uncertain,
A) assume they
Q32: Activities G,P,and R are the immediate predecessors
Q32: In deciding which activities to crash, one
Q34: Which of the following is a general
Q37: To determine how to crash activity times
A)
Q37: For an activity with more than one
Q39: Which of the following is always true
Q59: The main difference between CPM and PERT