A small electronics company assembles power supplies for use in computers, printers and Fax machines. They want to set up an assembly line to make their operation more efficient and plan to use line balancing with the longest-task-time heuristic. The demand for power supplies is 70 per hour, and the productive time per hour is 52 minutes. The following table provides details on their operation.
a.What is the cycle time?
b.What is the theoretical minimum number of workstations?
c.What tasks go into the first workstation?
d.How many workstations are needed for the entire line?
e.What is the assembly-line efficiency?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q41: _ is vertical expansion of job duties
Q47: Which is not true regarding fixed-position layout?
A)Synonymous
Q48: Which one of the following fits best
Q55: All of the following are true regarding
Q63: For the following assembly line data, balance
Q64: The nine tasks necessary to assemble a
Q67: Discuss the advantages and disadvantages of utilizing
Q67: A company is setting up an assembly
Q75: An assembly line with 28 activities is
Q84: Explain the sociotechnical approach to job design
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents