In a quick response manufacturing system,internal controls
A) should be established after the information system is designed and tested.
B) must be included within the design and development of the system.
C) should be based on existing manual controls.
D) can be excluded in such a system because there is so little human intervention in processing transactions.
Correct Answer:
Verified
Q96: In a production planning system,the production status
Q97: Which of the following objectives in a
Q98: Which of the following is the best
Q99: Which of the following is false regarding
Q100: Inventories serve as a buffer between different
Q102: Data is required from which of the
Q103: Activity-based costing (ABC)systems allocate overhead differently than
Q104: Which of the following is a common
Q105: The following production information has been gathered
Q106: CIM affects manufacturing overhead primarily by
A) increasing
Unlock this Answer For Free Now!