The following production information has been gathered from the records of the New Processes Manufacturing Company:
Product: Alpha Zeta
Units Produced 1,500 7,500
Direct material cost / unit $ 10 $ 22
Direct labor cost / unit 14 28
Direct labor hours / unit 1 2
Production machine setup 3 times 3 times
Engineering changes 1 time 2 times
Additional production information is as follows:
• Total setup costs (a part of total manufacturing overhead)= $21,500
• Total engineering changes (a part of total manufacturing overhead)= $9,500
• Total annual overhead cost = $288,750
• Total annual direct labor hours = 16,500
Required:
A.Calculate the ABC overhead allocation rate using the cost drivers given above.
B.Calculate the total cost per unit for each product using activity-based costing for the overhead allocation.
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q100: Inventories serve as a buffer between different
Q101: In a quick response manufacturing system,internal controls
A)
Q102: Data is required from which of the
Q103: Activity-based costing (ABC)systems allocate overhead differently than
Q104: Which of the following is a common
Q106: CIM affects manufacturing overhead primarily by
A) increasing
Q107: The following production information for the Murray
Q108: In a production planning system,the production loading
Q109: Which of the following reports specifies production
Q110: Which of the following is a way
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents