Solved

Consider the System Composed of Four Processes Linked by a Conveyor

Question 43

Multiple Choice

Consider the system composed of four processes linked by a conveyor belt. There is no storage between these processes pictured below and market demand of 50 units per hour drives the conveyor belt. Assume that no defective units are made. Which statement is best? Consider the system composed of four processes linked by a conveyor belt. There is no storage between these processes pictured below and market demand of 50 units per hour drives the conveyor belt. Assume that no defective units are made. Which statement is best?   A) There are about 18 units in the process at any given time. B) There is more actual time spent in Process 2 and Process 3 combined than in Process 1 and Process 4 combined. C) The flow rate through Process 1 is the highest. D) The flow rate through Process 4 is the highest.


A) There are about 18 units in the process at any given time.
B) There is more actual time spent in Process 2 and Process 3 combined than in Process 1 and Process 4 combined.
C) The flow rate through Process 1 is the highest.
D) The flow rate through Process 4 is the highest.

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions

Unlock this Answer For Free Now!

View this answer and more for free by performing one of the following actions

qr-code

Scan the QR code to install the App and get 2 free unlocks

upload documents

Unlock quizzes for free by uploading documents