Custom Cedar Products (CCP)manufactures a line of outdoor furniture.In April,CCP received an order Outdoor Spaces for ten 36 inch planter.The order from Outdoor Spaces became Job 1405 at CCP.A Materials requisition for Job 1405 is presented in the following section.In addition to the materials requisition,the labour time records (partial)or the week that these tables were made are presented.Other products were also being produced during that week,so not all labour belongs to Job 1405,but all labour belonging to Job 1405 is shown.
Requirements:
1.Calculate the total for the Materials Requisition form.Post the information from the Materials Requisition form to the Job Cost Record.
2.Complete the labour time records for each of the employees and post the information to Job1405 to the Job Cost Record.
3.Complete the Job Cost Record.
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q29: A receiving report is used to order
Q31: A receiving report is typically a duplicate
Q32: Which of these documents substantiates the balance
Q38: Which of these documents are used to
Q41: A source document for tracking employee hours
Q43: Custom Cedar Products (CCP)manufactures a line of
Q44: Custom Cedar Products (CCP)manufactures a line of
Q45: Which comes last in the flow of
Q54: When direct materials are requisitioned, they flow
Q60: Which comes third in the flow of
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents