Custom Cedar Products (CCP)manufactures a line of outdoor furniture.In May,CCP received an order Outdoor Spaces for 20 thirty inch planter.The order from Outdoor Spaces became Job 2100 at CCP.
A Materials requisition for Job 2100 is presented in the following section.In addition to the materials requisition,the labour time records (partial)or the week that these tables were made are presented.Other products were also being produced during that week,so not all labour belongs to Job 2100,but all labour belonging to Job 2100 is shown.
Requirements:
1.Calculate the total for the Materials Requisition form.Post the information from the Materials Requisition form to the Job Cost Record.
2.Complete the labour time records for each of the employees and post the information to Job2100 to the Job Cost Record.
3.Complete the Job Cost Record.
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q31: A receiving report is typically a duplicate
Q38: Which of these documents are used to
Q40: Custom Cedar Products (CCP)manufactures a line of
Q41: A source document for tracking employee hours
Q44: Custom Cedar Products (CCP)manufactures a line of
Q45: Which comes last in the flow of
Q47: For a manufacturer that uses job costing,show
Q48: Payroll costs for factory employees who do
Q60: Which comes third in the flow of
Q67: Manufacturing overhead costs can be directly traced
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents