The critical path for the network shown is:
A) A-E-H
B) B-H
C) A-D-G
D) C-F-H
E) C-I-J
Correct Answer:
Verified
Q76: An important assumption in PERT calculations is:
A)activity
Q77:
-What is the estimated mean time
Q78:
-What is the estimated mean time
Q79: What is the estimated mean time for
Q81: Which of the following are ways of
Q82: At which point does crashing of a
Q83:
-What is the probability that the
Q84: In crashing a project,a manager will generally
Q85:
-What is the estimated standard deviation
Q105: What is the estimated standard deviation in