(Students must compute the range per sample and overall r-bar)
-Given the previous results and analysis for the R-chart, one would:
A) conclude that the R-chart is in statistical control, and proceed to develop the x-bar chart.
B) conclude that the R-chart is not in statistical control, and proceed to develop the x-bar chart.
C) investigate sample # 3 as it is outside the R-chart control limits and redo the R-chart.
D) conclude that the variation is not random, and therefore all samples should be investigated.
Correct Answer:
Verified
Q1: (Students must compute the range per
Q2: A plastic cell phone case has
Q3: Table 1 Statistical Process Control (SPC)
Q4: (Students must compute the range per
Q6: Quality at the source means that quality
Q7: A plastic cell phone case has
Q8: Common cause variation _.
A) is controllable by
Q9: Table 1 Statistical Process Control (SPC)
Q10: Which of the following statements is NOT
Q11: Testing whether a computer boots up the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents