A company is using Kanban containers. There are two adjacent work centers, a downstream (using) and an upstream (producing) center. The using work center has a production rate of 200 parts per day and each container holds 20 parts. It takes 0.5 days for a container to make the entire cycle from the time it leaves the upstream center till it is returned, filled with production, and leaves again. The manager wants a safety factor (α) of 20 percent. The company is interested in reducing the number of containers.
a.What is the number of containers currently in use?
b.If the number of parts a container holds is increased to 24 parts, how many containers are needed?
c.If the company wants the number of containers (holding 20 parts each) to be 5, what must the safety factor become?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q74: The Timken Company used a Lean Six
Q75: Which of the following statements is TRUE
Q76: Kanban is the Japanese term for elimination
Q77: Compare and contrast a push system and
Q78: In a just-in-time (JIT) system, the computer
Q79: How does total productive maintenance (TPM) affect
Q80: Discuss the differences between lean production and
Q82: A manufacturer of automobile engines is designing
Q83: A company is using a Kanban system
Q84: Define a Kanban. Describe how it helps
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents