A company is using a Kanban system with 2 containers, each holding 50 parts, between a downstream (using) and an upstream (producing) work center. The using work center can handle 250 jobs per day. The average elapsed time for the entire cycle is currently 0.25 days. The company is concerned about the safety factor for the operation and the size of the containers.
a.What is the efficiency rating of the current operation?
b.If the company decides to use only one container, how many parts must it hold?
c.If the safety factor is changed to 0.12 and there are still 2 containers, how many parts must each container now hold?
Correct Answer:
Verified
View Answer
Unlock this answer now
Get Access to more Verified Answers free of charge
Q74: The Timken Company used a Lean Six
Q75: Which of the following statements is TRUE
Q76: Kanban is the Japanese term for elimination
Q77: Compare and contrast a push system and
Q78: In a just-in-time (JIT) system, the computer
Q79: How does total productive maintenance (TPM) affect
Q80: Discuss the differences between lean production and
Q81: A company is using Kanban containers. There
Q82: A manufacturer of automobile engines is designing
Q84: Define a Kanban. Describe how it helps
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents