C&M Machining is developing plans for a dedicated production line and needs to determine how many drill presses will be needed. Engineering estimates are that one drill press will be able to process 120 parts per hour. Daily demand is 2,400 parts. C&M operates one 8-hour shift per day. How many drill presses are needed to meet the capacity requirements?
A) 2 drills
B) 3 drills
C) 4 drills
D) 5 drills
Correct Answer:
Verified
Q14: When the average unit cost of a
Q15: Safety capacity or a capacity cushion is
Q16: Perform a capacity analysis of the process
Q17: Steve, an operations manager at Clan Corp.
Q18: Safety capacity is most closely related to
Q20: Perform a capacity analysis of the process
Q21: A medical equipment testing and calibration
Q22: The job that represents the bottleneck in
Q23: _ strategy matches the capacity additions with
Q24: _ is a strategy that waits until
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents