A print shop has four jobs that have to be processed through their only five-color press. They usually use the first come, first served (FCFS) rule of scheduling jobs. However, the customers are waiting in the lobby for these jobs so the shop wants to minimize the average waiting time. They are going to use the shortest processing time rule to do so. Processing times for each job are as follows (assume this is the arrival order) : Job A, 30 minutes; Job B, 17 minutes; Job C, 12 minutes; and Job D, 39 minutes.
-Using the shortest processing time (SPT) rule to sequence these jobs, the average waiting (flow) time is _____.
A) less than or equal to 20 minutes
B) more than 20 but less than or equal to 30 minutes
C) more than 30 but less than or equal to 40 minutes
D) more than 40 but less than or equal to 50 minutes
Correct Answer:
Verified
Q13: A movie theater requires the following
Q14: A new surgical facility called Cut
Q15: A movie theater requires the following
Q16: The table below includes processing times
Q17: The following five jobs, along with
Q19: The following five jobs, along with
Q20: The table below includes processing times
Q21: Which of the following is an example
Q22: Scheduling refers to determining the order in
Q23: Johnson's sequencing rule is used to sequence:
A)
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents