Services
Discover
Homeschooling
Ask a Question
Log in
Sign up
Filters
Done
Question type:
Essay
Multiple Choice
Short Answer
True False
Matching
Topic
Business
Study Set
OM 5
Quiz 15: Quality Management
Path 4
Access For Free
Share
All types
Filters
Study Flashcards
Practice Exam
Learn
Question 61
Essay
The GAP model recognizes five ways to mismanage the creation and delivery of high levels of quality. Describe each of the five problem areas (GAPS).
Question 62
Essay
List the three principles of total quality.
Question 63
Essay
Over the last year, 1,100 oral medications were administered at a health clinic. Quality is measured by the proper amount of dosage and the use of the correct drug. In three (3) instances, an incorrect amount was given, and in two (2) instances, the wrong drug was selected. What is the epmo metric?
Question 64
Essay
Summarize the philosophies of Deming, Juran, and Crosby, highlighting the key points on which they agree and on which they differ.
Question 65
Essay
Discuss different ways of defining quality and how these differ for goods and services.
Question 66
Essay
Explain the four components of the cost of quality.
Question 67
True/False
Using color-coded wires to reduce mistakes associated with assembling complex electronic products is an example of an application of the poka-yoke concept.
Question 68
Essay
Define root cause and describe root cause analysis.
Question 69
True/False
A Pareto diagram helps to understand the relationships between two variables and to verify possible cause and effect hypotheses.
Question 70
Multiple Choice
Which of the following statements regarding the Sunshine Enterprises case study is TRUE?
Question 71
True/False
The Seven QC Tools are designed to be simple so that workers at all levels can use them.
Question 72
Essay
An airline performed 4000 preflight inspections during one month. Each inspection checks 50 items. What is the maximum number of defects that could occur during a year if the process is operating at a six-sigma level?
Question 73
True/False
Using a cause-and-effect diagram helps identify the most likely causes of a problem so that further data collection can be carried out.
Question 74
Essay
What are the Seven Quality Control (QC) Tools and what is their significance in quality improvement? Briefly explain how each tool is used.
Question 75
True/False
Because of the amount of resources required, a kaizen blitz is generally performed outside of normal working hours over several weeks or months.
Question 76
Essay
A restaurant handles 500 customers every day. The restaurant encounters 25 service upsets during a typical day. The restaurant is open on all seven days of a week. If the restaurant receives 10 complaints per week, what is the epmo measure?