A high definition television manufacturer in Asia wants to develop a new smart television as fast as possible using Program Evaluation and Review Technique (PERT) and must complete the design and testing work first. The objective is to be the first to market the most innovative smart television on the planet and capture the first adopter market share. The manufacturer has determined the following activities, precedence relationships, and time estimates in days for the project:
Solutions are at the end of questions
-The standard deviation (not variance) of the critical path in days is _____.
A) less than or equal to 1.0 days
B) greater than 1.0 but less than or equal to 2.0 days
C) greater than 2.0 but less than or equal to 3.0 days
D) greater than 3.0 days
Correct Answer:
Verified
Q71: To compute the critical path, all nodes
Q72: Project managers need to be specialists, not
Q73: A high definition television manufacturer in
Q74: A Gantt chart is a useful tool
Q75: Project management objectives revolve around time and
Q77: A slack of 2 means the project
Q78: A statement of work would be developed
Q79: A high definition television manufacturer in
Q80: The critical path is the sequence of
Q81: Describe the four major steps in the
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents