Based on Alternative Water Supply-Single Project case study, which of the following statements is TRUE?
A) The Alternative Water Supply project completion time was 42 weeks.
B) Sustainability was not an issue in this case study.
C) The design for the intake and transmission main, along with the bid had to be completed in 35 weeks.
D) Engineering design accounts for 50 percent of the total cost for the project designed by Major Design Corporation (MDC) .
Correct Answer:
Verified
Q84: The Critical path method (CPM) and Project
Q85: When finding the earliest start (ES) time
Q86: When the beta probability distribution is used
Q87: Crashing refers to the process of shortening
Q88: The Critical Path Method (CPM) allows for
Q90: The slack for an activity is equal
Q91: Explain the stages of the project life
Q92: Crash time is the longest possible time
Q93: In the critical path method (CPM), there
Q94: Explain the purpose of Gantt charts.
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents