Irene Manufacturing uses a predetermined overhead allocation rate based on direct labor cost.At the beginning of the year,the company estimated total manufacturing overhead costs at $1,020,000 and total direct labor costs at $820,000.In June,Job 711 was completed.The details of Job 711 are shown below.
How much was the cost per unit of finished product? (Round any percentages to two decimal places and your final answer to the nearest cent. )
A) $157.50
B) $197.70
C) $169.70
D) $219.70
Correct Answer:
Verified
Q92: The Quadrangle Fabrication Plant suffered a fire
Q93: Q-dot Manufacturing uses a predetermined overhead allocation
Q94: Felton Quality Productions uses a predetermined overhead
Q95: Iglesias,Inc.completed Job 12 on November 30.The details
Q97: Gardner Machine Shop estimates manufacturing overhead costs
Q98: Gill Manufacturing uses a predetermined overhead allocation
Q99: Midtown,Inc.uses a predetermined overhead allocation rate of
Q100: Doric Agricultural Corporation uses a predetermined overhead
Q103: Ivade,Inc.uses a predetermined overhead allocation rate of
Q116: In a machine-intensive production environment,the most accurate
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents