Ventaz Corp manufactures glasses.The manufacturing cycle efficiency is 70%.What is its waiting time if the manufacturing lead time is 120 minutes per keyboard?
A) 38.00 minutes
B) 42.00 minutes
C) 48.00 minutes
D) 36.00 minutes.
Correct Answer:
Verified