With a design/build contract:
A) the owner serves as the renovation designer, with construction performed by in-house staff.
B) the construction contractor serves as the designer as well as the builder.
C) the designer provides designs to the contractor that constructs the project.
D) none of the above.
Correct Answer:
Verified
Q1: The property's renovation manager should clarify the
Q2: Equipment or materials that are functionally, operationally,
Q3: A good source of sample construction contracts
Q4: Major renovations are usually done on a
Q5: A facility life-cycle cost study is a:
A)set
Q6: Why is it a good idea to
Q8: What is a punch list?
A)It is a
Q9: Which of the following places the four
Q10: Which of the following estimating methods is
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents