Figure 4-20 Quasi-Tech Corporation produces specially machined parts. The parts are produced in batches in one continuous manufacturing process. Each part is custom produced and requires special engineering design activity (based on customer specifications) . Once the design is completed, the equipment can be set up for batch production. Once the batch is completed, a sample is taken and inspected to see if the parts are within the tolerances allowed. Thus, the manufacturing process has four activities: engineering, setups, machining, and inspecting. Costs have been assigned to each activity using direct tracing and resource drivers: Owens produces two models: Model X and Model Y. The following table shows how the two products consume activity.
Refer to Figure 4-20. First determine the overhead costs assigned to model D using the two most expensive activities for cost pools. The costs of the two relatively inexpensive activities are allocated to the two most expensive activities in proportion to their costs. (Round to two decimal places.) The engineering cost assigned to model D would be
A) $626,650.
B) $1,253,320.
C) $1,879,970.
D) $3,133,333.33.
Correct Answer:
Verified
Q162: Figure 4-21 Appleby Manufacturing uses an activity-based
Q164: Figure 4-20 Quasi-Tech Corporation produces specially machined
Q165: Figure 4-21 Appleby Manufacturing uses an activity-based
Q166: Figure 4-21 Appleby Manufacturing uses an activity-based
Q168: Figure 4-20 Quasi-Tech Corporation produces specially machined
Q169: Figure 4-20 Quasi-Tech Corporation produces specially machined
Q170: Figure 4-21 Appleby Manufacturing uses an activity-based
Q171: Figure 4-21 Appleby Manufacturing uses an activity-based
Q172: The collected data sets that are organized
Q172: Figure 4-21 Appleby Manufacturing uses an activity-based
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents