Figure 15-2 The following information relates to Cranmore Manufacturing:
To produce a unit of product: There is a wait time of 5 minutes before the cutting department begins a batch, 15 minutes between the cutting and welding departments, a move and pre-wait between welding and polishing of 12 minutes, and a move and pre-wait between the polishing and finishing departments of 8 minutes.
Refer to Figure 16-2. What is the production rate?
A) 12 units per hour
B) 20 units per hour
C) 15 units per hour
D) 7.5 units per hour
Correct Answer:
Verified
Q62: In calculating product costs for a value
Q64: In the calculation of product costs for
Q65: Which of the following is NOT considered
Q67: Figure 15 - 3 Based on the
Q71: Emphasis on departmental efficiency
A) causes bottleneck departments
Q71: If a facility has costs of $100,000
Q72: The pursuit of perfection is realized in
A)zero
Q73: In a lean environment, many overhead costs
Q75: The document used by the lean control
Q76: Which of the following is true in
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents