Program Design
A) Is left to programming / development staff (not systems analysts)
B) Is done in the implementation phase of the SDLC
C) Is done with CASE tools that automate the various process models, data models and user interface design into Visual Basic code
D) Is done by analysts and then the design is passed on to programmers to code
E) Consists of icons, metaphors and structures
Correct Answer:
Verified
Q1: By definition,external entities on the DFD:
A)Are used
Q5: The second step in creating a Physical
Q5: Physical DFDs will be shared with _
A)Project
Q6: In most automated cases,data stores from logical
Q12: The fifth step in creating a Physical
Q13: The first step in creating a Physical
Q15: In determining if a process is to
Q15: As analysts move from logical design to
Q17: The Human-Machine Boundary
A)Is the keyboard and screen
B)Builds
Q19: When changing a logical DFD into a
Unlock this Answer For Free Now!