Keith assembles peanut valves and the recorded data is displayed in the table.What is the select time for this job element if he is rated at 75%?
A) Greater than or equal to 3 minutes
B) Less than 3 minutes but greater than or equal to 2.7 minutes
C) Less than 2.7 minutes but greater than or equal to 2.4 minutes
D) Less than 2.4 minutes
Correct Answer:
Verified
Q22: The method used most often for setting
Q25: The continuous method of timing work elements
A)
Q34: When using a time-study approach,the standard time
Q37: Keith assembles peanut valves and the recorded
Q38: Garman observes a worker assembling peanut valves
Q41: A worker was observed for four cycles
Q42: During a time study,the following times were
Q46: Work sampling is one method of work
Q51: When using a work-sampling study,
A) the underlying
Q55: A worker was observed for four
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents