Risk involves the measurement or assessment of two parameters, the probability of an undesirable event occurring and ____.
A) the frequency of that event
B) the magnitude of the event's consequences
C) the duration of the event
D) the number of people affected by the event
Correct Answer:
Verified
Q51: _ occurs when a seller or lessor
Q52: _ software has long been required to
Q53: Even with safety precautions in place, the
Q54: A(n) _ requires several standards must be
Q55: After successful unit testing, the software units
Q57: When sued for negligence, a software developer
Q58: One approach to quality assurance is to
Q59: _ defines five levels of software development
Q60: _ is a standard, proven work process
Q61: The Capability Maturity Model Integration was developed
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents