Consider the following scenario,then choose which one of the options below corresponds to the level of CIRs and PIRs after consumption.Before consumption: Procurement proposal for CIRs: 50
Procurement proposal for PIRs: 50
A) CIRs: 50,PIRs: 0
B) CIRs: 50,PIRs: 50
C) CIRs: 0,PIRs: 0
D) CIRs: 0,PIRs: 50
E) CIRs: 100,PIRs: 100
Correct Answer:
Verified
Q44: What is SOP used for?
A)Creating an operational
Q45: Setup time is the time required to
A)Set
Q46: MRP type specifies
A)Whether the material is produced
Q47: The planning table is best defined as
A)An
Q48: Replenishment lead time is
A)The time between placing
Q50: The MRP technique calculates the requirements for
Q51: The lot size key specifies the
A)Optimum lot
Q52: What does SOP stand for?
A)Sales and operations
Q53: The manner in which CIRs consume PIRs
Q54: In SAP ERP production planning strategy,net requirements
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents