The MRP technique calculates the requirements for a material based on
A) Historical data.
B) Current data.
C) The material's dependence on other materials.
D) Material type.
E) Replenishment lead time.
Correct Answer:
Verified
Q45: Setup time is the time required to
A)Set
Q46: MRP type specifies
A)Whether the material is produced
Q47: The planning table is best defined as
A)An
Q48: Replenishment lead time is
A)The time between placing
Q49: Consider the following scenario,then choose which one
Q51: The lot size key specifies the
A)Optimum lot
Q52: What does SOP stand for?
A)Sales and operations
Q53: The manner in which CIRs consume PIRs
Q54: In SAP ERP production planning strategy,net requirements
Q55: After the SOP process has generated the