MPS creates planned orders for the MPS items and dependent requirements for all items in the BOM.
Correct Answer:
Verified
Q98: When using planning without final assembly,components are
Q99: The input to MRP is the independent
Q100: A product group groups products with similar
Q101: The lot size calculation step in MRP
Q102: The MRP list,unlike the stock/requirements list,highlights changes
Q104: SOP can be either flexible or standard.
Q105: The schedule lines control parameter applies to
Q106: A processing key is a control parameter
Q107: Net requirements calculation is one of the
Q108: After planning the master schedule items,MRP creates