The schedule lines control parameter applies to scheduling agreements.
Correct Answer:
Verified
Q100: A product group groups products with similar
Q101: The lot size calculation step in MRP
Q102: The MRP list,unlike the stock/requirements list,highlights changes
Q103: MPS creates planned orders for the MPS
Q104: SOP can be either flexible or standard.
Q106: A processing key is a control parameter
Q107: Net requirements calculation is one of the
Q108: After planning the master schedule items,MRP creates
Q109: The ERP system initially uses forward scheduling
Q110: The planning result report aggregates quantities for