Multiple Choice
For a process control chart a process is generally considered to be in control if
Question 2
Multiple Choice
In a process where a large number of defects are likely to occur
Question 3
Multiple Choice
In order to determine if the time required for students to take a final exam is excessive,five students were selected at random from each of six classes.If the process average is 123.77 minutes and the average range is 66.83 minutes,the upper and lower control limits of a 3-sigma x-chart are
Question 4
Multiple Choice
An example of a product or service quality attribute is
Question 5
Multiple Choice
If samples of 100 for a process are taken and p is 0.15,the upper and lower control limits for a 3-sigma p-chart are
Question 6
Multiple Choice
In order to determine if the time required for students to take a final exam is excessive,five students were selected at random from each of six classes.If the process average is 123.77 minutes and the average range is 66.83 minutes,the upper and lower control limits of a 3-sigma R-chart are
Question 7
Multiple Choice
In a "zone" pattern test each zone is how many standard deviations wide?
Question 8
Multiple Choice
In an Excel spreadsheet for a p-chart,if the total number of defectives for 20 samples of 100 observations each is in cell F26,the Excel formula for p is
Question 9
Multiple Choice
One of the general guidelines for identifying a pattern in a control chart is
Question 10
Multiple Choice
Wider control limits on a process control chart i.e. ,3 sigma as opposed to 2 sigma limits) makes the chart
Question 11
Multiple Choice
If the process capability index,C
pk
.
is greater than 1.00
,
then
Question 12
Multiple Choice
Statistical process control is a tool primarily for
Question 13
Multiple Choice
A cookie company makes chocolate chip cookies and it wants them to average 8 chocolate chips apiece.To control the quality of the production process the company should use a
Question 14
Multiple Choice
Control charts are typically used
Question 15
Multiple Choice
If 20 samples of a production process are taken and there are 240 total defects,the upper and lower control limits for a 3-sigma c-chart are
Question 16
Multiple Choice
A p-chart and R-chart are control charts for
Question 17
Multiple Choice
At a fast-food restaurant,if the average time to serve a customer is 3.75 minutes for 10 samples of size 5,and the average range for the samples is 0.50 minutes,the upper and lower control limits for a 3-sigma x-chart are