Figure 15-2
The following information relates to Cranmore Manufacturing: To produce a unit of product:
Cutting department 5 minutes per unit
Welding department 8 minutes per unit
Polishing department 3 minutes per unit
Finishing department 4 minutes per unit
There is a wait time of 5 minutes before the cutting department begins a batch, 15 minutes between the cutting and welding departments, a move and pre-wait between welding and polishing of 12 minutes, and a move and pre-wait between the polishing and finishing departments of 8 minutes.
-Refer to Figure 15-2. If Cranmore produces in batches of 10 units, how much time would have elapsed by the time the 10th unit is produced under a manufacturing cell environment (assuming the cell is processing continuously) ?
A) 60 minutes
B) 65 minutes
C) 150 minutes
D) some other amount
Correct Answer:
Verified
Q43: There are two basic types of non-value
Q45: In a traditional manufacturing setup
A)there is significant
Q49: The order fulfillment value stream focuses on
A)developing
Q50: In a demand-pull system
A)production is triggered by
Q51: Figure 15-1
The following information relates to Lancashire
Q53: The production rate
A) tells how many units
Q55: The value stream
A)is made up of all
Q57: Figure 15-1
The following information relates to Lancashire
Q58: Figure 15-1
The following information relates to Lancashire
Q74: Why might labor costs be reduced in
Unlock this Answer For Free Now!
View this answer and more for free by performing one of the following actions
Scan the QR code to install the App and get 2 free unlocks
Unlock quizzes for free by uploading documents